Undergrounds of new boulevard in Baku, Azerbaijan
Our Work
- Four undergrounds
of new boulevard are furnished.
- Floor
- walls
- ceiling of the undergrounds
They are furnished with innovative ceramic tiles with
the size 3000x1000x3mm &3000x1000x5mm
(Italy).
- At first was
done the installation of aluminum sub construction on walls and ceiling.
- Based on the
specification of the underground we have installed protective tiles of “Hekim
Board” on the walls on which was laid ceramic tiles with “MAPEI” adhesives and
sealants.
- Historical
pictures of the city was painted on ceramic tiles of the wall (Chemical process
– Italian technology).